Quadruple the work and double the price for a 2% grade?
Where I want to put my 6x5' shed is on top of pavers with a 2% grade. The shed is a Suncast BMS6584. I've built the form, and must've calculated incorrectly at first, because I'm realizing now that I need ~38 60lb bags of Quickrete for a 6'x6'x5.5" platform. The first shovel fulls would be dry before my middle-aged muscles get the form filled. I can get help, so that's not the problem.
The only reason I'm creating the slab is to level the 2% grade, 1.5" over 6'. Do I really need to go though 38 &$%#en bags of concrete for that? At this point, I'm almost of the mind to just put down some feet with 3/4" outdoor rated ply and build the shed on top.
Just set me straight. If I need the slab, I need the slab.