
A tiny small contract...
I was so glad to score an Earth slag contract... up until I saw its volume
Just a regular small batch in the Crust universe, I guess.

I was so glad to score an Earth slag contract... up until I saw its volume
Just a regular small batch in the Crust universe, I guess.
Folks,
need your opinion please on bios update. I got g535, MSI mobo, bios is powerspec house version, 1 year old.
all the parts except the case look like market generic, i.e. there no microcenter unique items. is it worth/safe to replace bios with the latest MSI version?
MSI motherboard, PWM mode of course, with smart fan on/off, auto detection on/off - no matter what are the settings I've never seen less than 750 RPM; at above 1200 it's getting louder than stock Lian fans I've got.
Hi folks,
I just got my desktop after years of exclusive laptop use. And I'd like to get a keyboard that is similar to laptop's experience:
- must be TKL (preferably 80%)
- must have backlight. Simple white is ok, no need of fancy RGBs.
- preferably on a quitter side
- preferably sound control (via dedicated buttons or via F buttons)
- under $60
Indented use: casual gaming, light typing, light coding
Material, wire(less), customization is not important
hi,
I need to arrange a Liftago pickup for my relatives who will arrive at Florenc bus station.
what nearby street or pin point is least crowded with traffic and is suitable to load luggage ?
thanks
Hi fellow owners,
I've noticed that on hot days the fuel door on my 2014 Elantra (manual release) will get stuck.
I could open it by pulling a wire via a 'secret door' in the trunk, but wondering if any of you were able to find the root cause of this issue and fix in permanently.
Thanks
The psychological floor of $60k is broken (again).
Get some juicy Wendy's burgers and enjoy the show
The bulk of the US power grid is operated by several deregulated local grid operators known as RTOs. When a developer wants to build a datacenter, it MUST submit a request to an RTO and get in line.
Let's check what's the current peak load in the largest RTOs vs the number of DC capacity requested.
ERCOT (the power grid of Texas): peak load is 85 GW vs 408 GW submitted
PJM (East Coast south of New England but north of Carolinas): 180 vs 337
MISO (states along the Mississippi river): 120 vs ~50
+++
To put things in perspective, the capacity of a BIG nuclear reactor is ~1 GW. Musk's Colossus mega super duper project is a mere 0.5 GW of capacity. The largest freaking US Nuclear power plant's capacity is ... 'just' 4.6 GW.
As the picture demonstrates, the USA has been adding roughly 10 GW/year.
Yet developers submitted over 700GW (!) of the gold rush applications. And I bet that 'analysts' covering Nvidia etc are using 700GW, not 10GW in their 'forward-looking projections'
then Mr funding secured would have run his Colossus data center 24/7, exploiting the infinite money glitch. yet we see that none of major corps owning data centers engaged into this ponzi. only questionable companies like Riot and Iren, which by the way are pivoting themselves to become providers of AI data center capacity.
Guess what - AOD! Once I turned it off, I am able to last for a day with moderate screentime use (and I limit battery charging to 90% to extend its life)