u/availableschedule650
Guess the train 5
- This train is available on multiple operators
- This train is an EMU
- This train can run on all electrified routes on each operator it is on
- This train has a max speed of around 90-110mph
UPDATED Leighton City Transport Map + Route List
This is an updated version of this post: https://www.reddit.com/r/stepfordcountyrailway/comments/1vtw8nb/leighton_city_transport_map_route_list/
Dldkddkkddk
╭╮╱╭╮╱╱╭╮╭╮╱╱╱╱
┃┃╱┃┃╱╱┃┃┃┃╱╱╱╱
┃╰━╯┣━━┫┃┃┃╭━━╮
┃╭━╮┃┃━┫┃┃┃┃╭╮┃
┃┃╱┃┃┃━┫╰┫╰┫╰╯┃
╰╯╱╰┻━━┻━┻━┻━━╯ gggghhhhdhfhdiieoeoeoeoeo
Ideas for Airlink Shuttle routes
*Turn Around
Esterfield shuttle:
Esterfield, Airport West*, Terminal 2*, Airport Central*, Terminal 1, Terminal 3
Benton Shuttle:
Benton, Airport Parkway, Airport Central, Terminal 1, Terminal 2*, Terminal 3
Airport Shuttle:
Airport Parkway, Airport Central, Terminal 1, Terminal 2*, Terminal 3
Morganstown Shuttle (updated):
Morganstown, Airport Parkway, Airport Central, Terminal 1, Terminal 2*, Terminal 3
Hampton Hargate Shuttle (updated):
Hampton Hargate, Airport Parkway, Airport Central, Terminal 1, Terminal 2*, Terminal 3
With these 3 new routes, it will make the class 345 more worth the 4500 points.
How I would change Express to Esterfield
With some track changes connecting the main line tracks to the Waterline tracks, R092 (Stepford Central <> Esterfield) no longer stops at Morganstown and Leighton Stepford Road. Instead, it stops at St Helens Bridge & Benton.
R084 (Newry Harbour <> Llyn-By-The-Sea) now goes to Esterfield after Benton for a turn around to Leighton Stepford Road.
SCR before 2.4 update
Inspired by this post: https://www.reddit.com/r/stepfordcountyrailway/comments/1onex57/scr_map_before_23_update/
SCR Trains except Australian (Specifically New South Wales)
Connect:
| Train | Routes |
|---|---|
| A Set | Slow |
| H Set | Slow & Semi-Fast |
| J Set (Triple) | Semi-Fast |
| M Set | Slow |
| N Set | Semi-Fast |
Express:
| Train | Routes |
|---|---|
| D Set | All electric routes except Llyn superfast |
| N Set | All routes except Llyn superfast |
| P Set | All routes except Leighton Express, Llyn superfast & Newry Shuttle |
| R Set | All routes except Leighton Express & Newry Shuttle |
| X Set | All routes except Leighton Express & Newry Shuttle |
Metro:
| Train | Routes |
|---|---|
| B Set | All routes except tram train, R137, & Willowfield shuttle to Stepford Bay |
| J Set (Double) | All routes except tram train |
| T Set | All routes except tram train, R137, & Willowfield shuttle to Stepford Bay |
Airlink:
| Train | Routes |
|---|---|
| D Set | All routes except Airlink Shuttle |
| D Set (Airlink Shuttle livery) | Airlink Shuttle only |
| H Set | All routes except Airlink Shuttle |
| P Set | All routes except Airlink Shuttle |
Waterline:
| Train | Routes |
|---|---|
| B Set | All electrified routes |
| J Set | All routes |
| K set | All electrified routes |
| S Set | All electrified routes |
Leighton City Transport Map + Route List
I'm sorry but why is Stepford Connect on Logopedia??
I get SCR is also on logopedia but Stepford Connect is a fictional brand!! I am not saying someone should remove this, I am saying that it is weird Stepford Connect has a logopedia page.