

Update: Top on and everything is flush and level. Thank you all for the tips! Now to put on my 4x4 legs and the lower shelf frame 😎
I ended up using some clamps and slowly adjusting the frame to be level with the top. Once I got it as flush as I could I screwed down the middle on one side then worked my way around the corners.