Recommendations for a custom metal fabricator / staircase contractor (UWS)?

Recommendations for a custom metal fabricator / staircase contractor (UWS)?

We are currently doing a major apartment renovation on the UWS and I’m looking for recommendations for a custom metal fabricator or specialized railing contractor.

We have an existing stainless steel staircase with a wire mesh infill, and we want to swap the mesh out for a 10-cable horizontal system.

The specifics of the job:

* **It must be done in-place:** The staircase cannot be dismantled, so all the work (drilling, tapping, fitting) has to happen on-site. (The apartment is currently a construction zone, so noise and dust are not an issue). * **The approach:** A previous contractor scoped this out before COVID but retired before doing the work. His plan was to keep the existing welded tabs that hold the mesh, use an adapter on them, and run the new cables directly from those tabs. I'm looking for someone who can execute this or suggest a similarly clean in-place alternative.

Does anyone have a go-to architectural metal shop, fabricator, or specialized contractor who takes on custom residential modifications like this in Manhattan?

I have a full set of photos, hardware close-ups, and the retired contractor's mockups ready to share with anyone who might be a good fit. Appreciate any leads!

reddit.com
u/JustAGuy10024 — 2 days ago

Field machining advice: Best way to drill/tap stainless in-place and adapt existing welded tabs?

Hey folks, looking for some technical advice on an in-place modification I need to get done on a stainless steel staircase.

We are removing an old wire mesh infill and converting it to a 10-cable horizontal system. The catch: the staircase cannot be dismantled. All the work needs to be done in the field. (The place is a gut-renovation construction zone right now, so making a mess or throwing chips is perfectly fine).

A previous contractor scoped this out before COVID but retired before the job happened. I'm trying to figure out the best way to execute his plan or find a smarter alternative before I start bringing in local fabricators.

The Challenges:

1. Adapting the existing tabs:

The current mesh is held to the end posts by welded tabs. The retired contractor suggested keeping these welded tabs and using some sort of adapter to attach the new horizontal cable tensioners directly to them (rather than cutting the tabs off and trying to grind/re-grain the post flush). Have any of you tackled something similar? What kind of hardware or adapter would mate well to a flat welded tab to hold a cable tensioner securely?

2. Drilling & tapping stainless in the field:

If we end up having to drill and tap the main posts to receive new cable end terminations, what is your recommended setup for doing this by hand/on-site without work-hardening the hell out of the stainless? Specific bits, tapping fluids, or portable fixturing (like a mag drill base for non-magnetic stainless?) you'd recommend?

3. The intermediate posts:

The cables need to be supported mid-span. The previous guy assumed we'd just drill clearance holes straight through the intermediate posts. If we go that route, what's the best way to jig/fixture it so we get 10 perfectly aligned holes down the line? Alternatively, are there any clever bolt-on/clamp-on standoffs we could use to avoid drilling through the intermediate posts entirely?

I’ve attached a few photos so you can see what I'm working with: a wide shot of the stairs, a close-up of the existing welded tabs, and the previous contractor's design concept.

Any tooling recommendations or hardware ideas are hugely appreciated!

u/JustAGuy10024 — 3 days ago

Suggestions on how to modify my stainless steel staircase?

I’m looking for some input on the best approach to modify an existing stainless steel staircase in my apartment. We are currently doing a major renovation to combine adjacent units, so the space is already set up for heavy, messy work—dust and noise aren't a concern right now. However, the staircase cannot be dismantled; all work needs to be done in place.

Currently, the stairs and upper landing have a stainless steel wire mesh infill that is held by welded tabs. I want to remove the netting and replace it with a 10-cable horizontal system.

A previous contractor actually scoped this out before COVID, but he retired shortly after, so the job never got done. His proposal was to keep the existing welded tabs, use an adapter on them, and attach the horizontal cables directly to those same tabs.

My main questions for the group:

  1. Hardware: What kind of adapters or hardware would work best to transition from the existing welded tabs to a clean, tensioned horizontal cable setup?
  2. Intermediate Posts: The retired contractor assumed we would need to drill clearance holes in the intermediate posts for the cables to pass through. I'm open to that, but are there other, potentially cleaner ways to handle the cable routing on those middle posts?
  3. In-place execution: Since this all has to be fabricated and tensioned in place, are there any specific tools, techniques, or pitfalls to watch out for?

I’ve attached photos of the current full staircase, close-ups of the existing tabs/hardware, and the generic proposal/design plan from the retired contractor for reference.

Thanks in advance for any ideas!

u/JustAGuy10024 — 3 days ago
▲ 8 r/Welding+1 crossposts

Suggestions on how to modify my steel staircase?

I’m looking for some input on the best approach to modify an existing stainless steel staircase in my apartment. We are currently doing a major renovation to combine adjacent units, so the space is already set up for heavy, messy work—dust and noise aren't a concern right now. However, the staircase cannot be dismantled; all work needs to be done in place.

Currently, the stairs and upper landing have a stainless steel wire mesh infill that is held by welded tabs. I want to remove the netting and replace it with a 10-cable horizontal system.

A previous contractor actually scoped this out before COVID, but he retired shortly after, so the job never got done. His proposal was to keep the existing welded tabs, use an adapter on them, and attach the horizontal cables directly to those same tabs.

My main questions for the group:

  1. Hardware: What kind of adapters or hardware would work best to transition from the existing welded tabs to a clean, tensioned horizontal cable setup?
  2. Intermediate Posts: The retired contractor assumed we would need to drill clearance holes in the intermediate posts for the cables to pass through. I'm open to that, but are there other, potentially cleaner ways to handle the cable routing on those middle posts?
  3. In-place execution: Since this all has to be fabricated and tensioned in place, are there any specific tools, techniques, or pitfalls to watch out for?

I’ve attached photos of the current full staircase, close-ups of the existing tabs/hardware, and the generic proposal/design plan from the retired contractor for reference.

Thanks in advance for any ideas!

u/JustAGuy10024 — 3 days ago

Correct process/politicians to petition in NYC to adopt the new optional full tax exemption for 100% rated vets?

As many people know, NYS recently passed legislation that allows local municipalities to fully exempt 100% rated vets from property taxes. NYC currently has some exemption but it is capped and not full exemption. What is the legislative process required for NYC to adopt this? Who should we reach out to? I'm sure other non-NYC vets have similar questions but given the complexity of NYC gov, I assume it's a bit more complicated here. Would be great for interested NYC vets to align on a clear plan of action that we can all follow.

reddit.com
u/JustAGuy10024 — 2 months ago
▲ 9 r/RunNYC

I'd like to get a few meaningful marathon medals from past races engraved (London, Tokyo, Boston, etc). I have a bunch so I'm hoping I can get a volume discount at a local place that does good work. Any suggestions? I'm in the UWS so all other things (ie price and quality of work), closer is preferable.

reddit.com
u/JustAGuy10024 — 4 months ago

I'm 46 y/o male. I can consistently run 2:52-2:55's and feel generally fine'ish during a race. Current PR is 2:48 when I was 44 (Houston Marathon). I pushed hard during that race and felt like I was running up against my natural limitations. Since that time I focused on mid 2:50s as race targets mostly bc I didn't want to do the suckfest of sub 2:50. I'm running Chicago this fall and I'm toying with the idea of pushing for a new PR and a stretch goal of sub 2:45. Interested to hear what your training looks like (mpw, example track workout, block length, etc), your carb plan for the race, and anything else you did that you felt gave you that added edge.

reddit.com
u/JustAGuy10024 — 4 months ago