Future of the rest of Line 3 Right of way?
Does the TTC/Toronto have plans for the remaining Line 3 elevated right of way? I don’t know how it could be used for future transit considering Line 3 would derail on it and I thought the new bus RT route would use the elevated section but doubt it's big enough for buses not to mention the added cost.
The elevated portion would be good to rehab and turn it into a park or green space.
Either way, they need to redo most of Kennedy, the concrete brutalism is distracting not to mention the bus lane maze.