Hi all,
Looking for a second opinion before I start digging. Full DIY, no experience with retaining walls before this, so please be as blunt as needed.
The situation: existing sloped concrete driveway with a dip at one end. Plan is to build a retaining wall across the dip, fill behind it, and end up with a level parking platform for one small EV.
Photo of the actual site is attached, along with a section drawing I’ve put together showing the spec I’m planning.
Key numbers:
• Wall: 1,350mm total height (300mm below current slab level up to finished drive level), 6 courses of 215mm hollow concrete block
• Footing: 600mm wide x 300mm deep, dug to firm ground (~500mm below the old slab, which turned out to be a thin 100mm slab, not a proper foundation, so I’m breaking that section out and founding on the ground beneath)
• H12 rebar starters at 450mm centres, cast into the footing, cores filled solid
• Wall retains ~1m of compacted Type 1 fill, WITH a car parked on top (surcharge load)
• Drainage: perforated land drain + clean stone pocket + weep holes at the base
• Wall butts existing masonry walls at both ends
• 1.1m railing on top of the wall (there’s a further ~1m drop to a garden on the other side)
What I’m unsure about / would appreciate eyes on:
1. Is 215mm hollow block with H12 @ 450 actually adequate for 1.35m retained height plus a vehicle surcharge, or does that need thickening/more steel?
2. Footing size — 600x300 — enough given the surcharge, or should I be going wider/deeper?
3. Anything in the drainage detail that looks wrong or missing?
4. Am I right to be founding on natural ground rather than the old 100mm slab, or is there a case for using it?
I know the honest answer might be “get a structural engineer,” and I am budgeting for one to check the final design before I pour anything — this post is really to get a rough gut-check first so I go into that conversation with sensible questions, not to skip it. Everything above is still draft/preliminary.
Why do people physically nail plasterboard onto walls and ceilings, especially when they haven’t insulated (hence why I’m taking it off)?
Any hacks for taking it off more whole?
Any top tips before I make a good start?
Have taking a lot of roof plasterboard off, with a lot more to go, as it’s not insulated. Planning 50mm insulation there.
Once that’s done, and boarded up, I’m probably going to skip plastering to save time and money before the baby.
Then underlay and carpet last.
Any advice or insight would be great.
Curious what you guys got planned and want to finish or start this year.
Mine is an attic conversion into an office!
Every dad eventually chooses a side.
Not politically. Spiritually.
You buy one drill…
then suddenly your entire garage becomes:
yellow,
red,
blue,
green,
or “whatever was on sale at Screwfix.”
So let’s settle it.
🛠️** BEST TOOL BRAND FOR**…
🔋 Cordless Drills & Drivers
Choose your champion:
🟨 DeWalt
🟥 Milwaukee
🟦 Makita
🟩 Ryobi
🟧 Bosch
⚫ Hikoki
🟪 Festool
💸 Lidl/Parkside
🤷 “Whatever survives my abuse”